    How would you do it (Roof Pitch Adjustment) [TUTORIAL]

    Scheduled Pinned Locked Moved SketchUp Discussions
    sketchup
    11 Posts 3 Posters 2.6k Views 3 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • AnssiA Offline
      Anssi
      last edited by

      I would calculate the ratio needed, and scale the whole roof in the blue direction the required amount, and then correct the fascia heights afterwards.

      Anssi

      securi adversus homines, securi adversus deos rem difficillimam adsecuti sunt, ut illis ne voto quidem opus esset

      1 Reply Last reply Reply Quote 0
      • TIGT Offline
        TIG Moderator
        last edited by

        Make the whole roof one group above the fascia line.
        Draw a long vertical line up from the fascia of the biggest roof outside of this and rotate it 45 degrees [==12:12].
        Draw a line from its bottom end up the roof slope - inference Magenta = up-slope to the ridge.
        Draw a vertical from the ridge to the 45 degree line and erase the unwanted bits - the vertical line represents the maximum extra height needed on the roof.
        Select the roof group and Scale it using the top-center handle and snap to the top end of this temporary vertical line - the roof now has 12:12 slopes... ❓

        TIG

        1 Reply Last reply Reply Quote 0
        • pmolsonP Offline
          pmolson
          last edited by

          Thanks, I knew you guys would have a trick.

          I did as you said and it took all of 15 seconds to change all 10:12 pitches to 12:12.

          Now just a little clean up on the intersecting different pitch shed roofs.

          Thank you very much.

          p

          1 Reply Last reply Reply Quote 0
          • pmolsonP Offline
            pmolson
            last edited by

            soffit-Fascia.jpgOk, I think I am dense.

            I got the roof pitch adjustment trick. It's great.

            Now I want to expand the entire peremiter of my soffit & fascia
            from a 2'-1" overhang to a 2'-8" overhang.

            I tried applying the same logic used to adjust the roof by:

            1. make soffit & fascia a group.
            2. determine scale factor (this is the thing I am getting wrong I think)
              2'-8" divided by 2'-1" = 1.28 scale factor
            3. use scale tool grabbing a corner "uniform scale by opposite points"
              and enter 1.28

            The result is a much larger adjustment than the 7" increase I am looking for.

            What am I doing? What should I be doing? What is the meaning of life? πŸ˜•

            p

            1 Reply Last reply Reply Quote 0
            • TIGT Offline
              TIG Moderator
              last edited by

              You want to make the whole roof-eaves bigger by 7"x2 [as the eaves get bigger in two directions] in both X & Y.
              Make a Group of the horizontal eaves parts.
              Place Guide-lines 7"x2=14" off one of the the X & Y sides each
              Scale the Group in one axis at a time - so that it is increased up to these maker-clines.
              It should now be the bigger size by 7" per side ?
              If you Scale the whole roof by this 7" the pitch will no longer be 12:12 as the slope will be very slightly flatter...
              Redo the vertical scaling trick on the sloping-roof parts group back to 45 degrees [12:12].
              Projecting dormers etc will also scale disproportionately [aaargh]
              It's probably be quicker to remake the parts right than it is to try and fix them ? πŸ˜’

              TIG

              1 Reply Last reply Reply Quote 0
              • pmolsonP Offline
                pmolson
                last edited by

                Thanks TIG,

                I reached the same conclusion shortly after asking the question.
                I still made it harder than it had to be though.

                I measured the full x and y distances of the whole group and divided those numbers into the full distances plus 14" to get a scale factor for the x & y and then scaled them independently.

                Your more graphic method is much simpler. πŸ‘

                The dormers are no big deal, I have a bunch of pre drawn dormer roofs with
                different pitches and I will just plunk new ones in.

                Thanks again.

                p

                1 Reply Last reply Reply Quote 0
                • TIGT Offline
                  TIG Moderator
                  last edited by

                  Offset on the eave's soffit + pushpull would add 7" all round too...

                  TIG

                  1 Reply Last reply Reply Quote 0
                  • pmolsonP Offline
                    pmolson
                    last edited by

                    Yes, that is the most straight forward way to handle the soffit & fascia, but
                    bringing the roof perimeter out to the new fascia position is where the scale
                    group trick will come in handy.

                    p

                    1 Reply Last reply Reply Quote 0
                    • pmolsonP Offline
                      pmolson
                      last edited by

                      I was fooled,

                      I put horizontal x & y fascia parts into separate groups as you suggested and scaled
                      them independently to a reference line. The result was that the face that is in
                      line with the scale grip moved the correct distance but the other faces within
                      the group moved a lesser amount seemingly based on how far away they are from
                      the scale grip plane.

                      I may not be explaining this clearly and will try to give a visual latter.

                      I must make money right now and will have to re-visit this latter.

                      For the mean time what I will do is offset, pushpull the fascia and the
                      move each roof edge line individually letting it distort the roof pitch
                      and adjust the pitch after the fact.

                      Off to work.

                      p

                      1 Reply Last reply Reply Quote 0
                      • TIGT Offline
                        TIG Moderator
                        last edited by

                        In hindsight I recommend using Offset rather than Scale - then you can fix it at 7"+ ?

                        TIG

                        1 Reply Last reply Reply Quote 0
                        • 1 / 1
                        • First post
                          Last post
                        Buy SketchPlus
                        Buy SUbD
                        Buy WrapR
                        Buy eBook
                        Buy Modelur
                        Buy Vertex Tools
                        Buy SketchCuisine
                        Buy FormFonts

                        Advertisement