Thanks, Mike! It's been a fun job. Alot of unique challenges. All of the walls and floors are all concrete. The site has been one of the biggest challenges. The slope is around 50% the retaining wall in the back is 34' tall with 86 helical piers drill 60'+ into the mountain.

The layout of this project was tough with the slope and organic shape of the house. We used a Trimble RI total station to set points straight from the model. Over nearly two years of forming and poring concrete the building corners finally met within 1/4''.

There is no wood framing on this project aside from the timber work. All of the timbers are white oak the longest one being over 37'.