sketchucation logo sketchucation
    • Login
    ℹ️ Licensed Extensions | FredoBatch, ElevationProfile, FredoSketch, LayOps, MatSim and Pic2Shape will require license from Sept 1st More Info

    From SketchUp to Reality

    Scheduled Pinned Locked Moved Corner Bar
    91 Posts 22 Posters 8.5k Views 22 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • daleD Offline
      dale
      last edited by

      Gaieus
      I'll post some cliff topper in a bit, and feel free to move the thread if you wish.
      I am intending it as an ongoing chronicle, so it will get lengthy.

      Just monkeying around....like Monsanto

      1 Reply Last reply Reply Quote 0
      • GaieusG Offline
        Gaieus
        last edited by

        No problem with it posted here of course (especially if you are planning to show the real home WIP)

        I have just had a nice lunch and thought I was kidding a bit. 😆

        Gai...

        1 Reply Last reply Reply Quote 0
        • daleD Offline
          dale
          last edited by

          The house is about 1300 sq ft, and is ICF (insulated concrete forms) from foundation to the top of the main floor walls.
          Her is the start of the excavation through the beginning of the Quadlock ICF placement.Screen shot 2011-09-07 at 7.19.02 AM.png
          Here is Judy (some of you met her at Basecamp) on the labour force on footings.Screen shot 2011-09-07 at 7.20.39 AM.png
          More to come!


          Screen shot 2011-09-07 at 7.24.26 AM.png


          Screen shot 2011-09-07 at 7.24.45 AM.png

          Just monkeying around....like Monsanto

          1 Reply Last reply Reply Quote 0
          • Mike LuceyM Offline
            Mike Lucey
            last edited by

            Dale,

            This looks it will be a very interesting thread. Will you keep posting updates?

            Mike

            Support us so we can support you! Upgrade to Premium Membership!

            1 Reply Last reply Reply Quote 0
            • daleD Offline
              dale
              last edited by

              Hi Mike
              I am planning on updating regularly. We are actually just finished framing, so I have a lot of posting to do to catch up,and of course then there is the actual act of building.
              So I'll be adding regularly.
              Cheers

              Just monkeying around....like Monsanto

              1 Reply Last reply Reply Quote 0
              • Mike LuceyM Offline
                Mike Lucey
                last edited by

                That's great Dale. Looking forward to 'keeping an eye on the build' ..... a bit like building inspections but virtual ..... its been a while since I was 'on the road' doing that kind of work 😉

                Support us so we can support you! Upgrade to Premium Membership!

                1 Reply Last reply Reply Quote 0
                • StilTegS Offline
                  StilTeg
                  last edited by

                  I was about to do the same ... Unfortunately the property was no longer for sale ... 😢

                  doing technical engineering on SketchUp ... without plugins

                  1 Reply Last reply Reply Quote 0
                  • N Offline
                    notareal
                    last edited by

                    I wish all the best for you project! Been there, done that... (actually my project introduced SU and wonderful world of rendering for me). If you or your wife ever get exhausted, remember that you can always hire some labor and take some leisure time with your wife - it's better than hitting your head to the wall.

                    Welcome to try [Thea Render](http://www.thearender.com/), Thea support | [kerkythea.net](http://www.kerkythea.net/) -team member

                    1 Reply Last reply Reply Quote 0
                    • Dave RD Offline
                      Dave R
                      last edited by

                      Dale, very nice. I'm going to follow your project with great interest.

                      How did you find the ICFs to set up? My wife and I have talked about using them but around here, most of the contractors prefer to pour conventional walls or set block. they don't seem to know about the ICF walls so they don't want to use them.

                      Etaoin Shrdlu

                      %

                      (THERE'S NO PLACE LIKE)

                      G28 X0.0 Y0.0 Z0.0

                      M30

                      %

                      1 Reply Last reply Reply Quote 0
                      • mitcorbM Offline
                        mitcorb
                        last edited by

                        Hi, Dale:
                        I wish you good fortune in this bold undertaking.
                        What is the recommended height interval for concrete placement for the ICF system? This looks like it would be a very effective basement wall construction.

                        I take the slow, deliberate approach in my aimless wandering.

                        1 Reply Last reply Reply Quote 0
                        • T Offline
                          troyhome
                          last edited by

                          This is a good example of SU as BIM for the rest of us 😄
                          Thanks for sharing

                          IOviz.com
                          SU Pro 2024 PC

                          1 Reply Last reply Reply Quote 0
                          • EarthMoverE Offline
                            EarthMover
                            last edited by

                            Fascinating process. Can't wait to see more Dale! What a fantastic accomplishment, to design and build your own home. I hope to one day do the same. 👍 👍

                            3D Artist at Clearstory 3D Imaging
                            Guide Tool at Winning With Sketchup
                            Content Creator at Skapeup

                            1 Reply Last reply Reply Quote 0
                            • daleD Offline
                              dale
                              last edited by

                              Thanks for the kind words and encouragement!
                              I have had a few PM's on the ICF system, so I'll chat about it for a bit.
                              I have experience with 2 systems, Quadlock, and Arxx. I am most fond of Quadlock, but that is for two reasons:
                              I've used it on 19 projects, so it is the one I am most familiar with.
                              It ships as 1'x 4' flat panels, and you put the panels together with nylon ties. Other systems like Arxx ship already put together, and components like corners are already assembled.
                              For me this may be a disadvantage as I tend to work in remote areas, so shipping is more efficient with flat panels, rather than blocks with 8" of space between them.
                              And secondly if one of the corner components is damaged in shipping, I am at a stand still until I get another shipped. With Quadlock, since I assemble the panels, this can't happen.
                              In the end all the ICF systems I have seen used do there job well, so it is mostly a matter of preference.Screen shot 2011-09-08 at 6.28.50 AM.png
                              In the photo above, you can see the yellow nylon ties on the top row of ICF, and the system I use for window rough bucks.
                              The bucks are 2x12, with a 1/2" plywood strip added to build the 11 1/4" 2x12 out to the actual 12" thickness of the ICF wall. Then you case these with 1x4's which are also screwed to the wall ties preventing blowout.
                              The sill of the bucks are 2-2x4's that have a space left open in the middle so that you can be sure you are getting the concrete to completely fill the forms under the windows.
                              The concrete wells up into this space, and you trowel it off. This also serves to embed the buck which remains in place to fasten windows to.

                              Just monkeying around....like Monsanto

                              1 Reply Last reply Reply Quote 0
                              • daleD Offline
                                dale
                                last edited by

                                The ICF systems are really like playing with Leggo, on an adult scale.It took Judy and I about a week to form and brace the foundation level forms.
                                This time could be cut way down on a simple rectangular building, but we had several "T" walls for our entrance way, and fireplace foundation, so this slows you down.Screen shot 2011-09-08 at 6.39.28 AM.png
                                This is a shot of quadlock and ties. This particular panel setup has a 2" ICF panel on one side, and a 4" on the other for greater insulation value. The ties can be ordered to allow for a 6",8",10", or 12" concrete thickness.
                                To make the building more energy efficient, I cast in Simpson Strong Tie ICFVL hangers, so that I would be able to hang my floor inside the wall and have no exposed (air leaking) rim joist.
                                These are complete engineered systems that you slot in through the styrofoam and then pour in place. Then you bolt your rim joist to these.


                                Screen shot 2011-09-08 at 6.47.38 AM.png

                                Just monkeying around....like Monsanto

                                1 Reply Last reply Reply Quote 0
                                • daleD Offline
                                  dale
                                  last edited by

                                  But this is also all about SketchUp and so we didn't arrive at this design without going through others. Attached below is one of the early designs, as you can see a totally different building.
                                  We both really liked this one, but it seemed a bit much for just the two of us, so we scaled down and went back to the modeling board.Picture 995.png
                                  Here, one of my early forays with Thea.McBride earlier.png

                                  Just monkeying around....like Monsanto

                                  1 Reply Last reply Reply Quote 0
                                  • daleD Offline
                                    dale
                                    last edited by

                                    Concrete pump truck in action pouring the lower floor (foundation). We poured to about a foot (304 mm) over the cast in strong ties. This allowed us to frame the main floor, and have a platform to work from for the second floor.Screen shot 2011-09-09 at 5.54.11 AM.png

                                    Just monkeying around....like Monsanto

                                    1 Reply Last reply Reply Quote 0
                                    • daleD Offline
                                      dale
                                      last edited by

                                      Placing the main LVL beam in the cast in beam pocket. It is a 3 ply 14" LVL.
                                      We are really taking advantage of mass in this house, so there will be in floor hydronics on both floors, with a 2" acid stained concrete floor for most of the main floor, with some areas of stone. This will all be fed by a ground source Geo-exchange system.
                                      The load on this beam is fairly significant, with the floor loads coming in at 50,070 lbs (22,711 Kg)Screen shot 2011-09-09 at 6.08.04 AM.png
                                      The first photo also shows the Resisto peel and stick foundation coating in place, which laps down over the footing.


                                      Screen shot 2011-09-09 at 6.08.53 AM.png

                                      Just monkeying around....like Monsanto

                                      1 Reply Last reply Reply Quote 0
                                      • daleD Offline
                                        dale
                                        last edited by

                                        So with the beam in place we are unloading the TJI floor joists in this photo. The LVL is a drop beam so that electrical and plumbing can run in the joist cavity. The TJI's are full span, as were the rim joists which the hang off of with joist hangers.
                                        Somehow Judy and I managed to manhandle these 34'(10.36 m)long beasts into place.Screen shot 2011-09-09 at 6.17.04 AM.png

                                        Just monkeying around....like Monsanto

                                        1 Reply Last reply Reply Quote 0
                                        • daleD Offline
                                          dale
                                          last edited by

                                          Once again SketchUp to the rescue, as with a floor load that is that heavy, it is not easy to find a pre-made telepost that can stand that load.
                                          So I SketchUpped the post and emailed it to my structural engineer. He made a few changes to bolt hole locations, and we had a local fabricator build it.


                                          Screen shot 2011-09-09 at 6.23.59 AM.png


                                          Screen shot 2011-09-09 at 6.24.24 AM.png


                                          Screen shot 2011-09-09 at 6.24.45 AM.png

                                          Just monkeying around....like Monsanto

                                          1 Reply Last reply Reply Quote 0
                                          • L Offline
                                            llaves
                                            last edited by

                                            Looks like this will be interesting to follow. Two comments, based on our experience:

                                            1. Gophers seem to love the styrofoam in the ICFs. Maybe the Resisto will keep them out, but I wish the product was available with a hardware cloth covering. If you haven't buried your footings, you could still cover the foam. On the other hand, you mention that you've used ICFs on 18 projects. Have gophers plagued the owners of these houses?
                                            2. If you're going to acid stain the floors, remember that everything that happens to the concrete between now and then will telegraph through the stain. Cover the floors, preferably with something like 1/8" masonite. If that's too expensive, a couple of layers of paper, and keep up with all the tears that will occur between now and staining.
                                            1 Reply Last reply Reply Quote 0
                                            • 1
                                            • 2
                                            • 3
                                            • 4
                                            • 5
                                            • 3 / 5
                                            • First post
                                              Last post
                                            Buy SketchPlus
                                            Buy SUbD
                                            Buy WrapR
                                            Buy eBook
                                            Buy Modelur
                                            Buy Vertex Tools
                                            Buy SketchCuisine
                                            Buy FormFonts

                                            Advertisement