sketchucation logo sketchucation
    • 登入
    Oops, your profile's looking a bit empty! To help us tailor your experience, please fill in key details like your SketchUp version, skill level, operating system, and more. Update and save your info on your profile page today!
    🔌 Smart Spline | Fluid way to handle splines for furniture design and complex structures. Download

    How to make this into a log cabin

    已排程 已置頂 已鎖定 已移動 Newbie Forum
    sketchup
    47 貼文 7 Posters 5.3k 瀏覽 7 Watching
    正在載入更多貼文
    • 從舊到新
    • 從新到舊
    • 最多點贊
    回覆
    • 在新貼文中回覆
    登入後回覆
    此主題已被刪除。只有擁有主題管理權限的使用者可以查看。
    • J 離線
      jessejames
      最後由 編輯

      Charlie,
      Nice improvement, you have some good ideas in there.

      DesignerGay,
      I think what we have here is a hodgepodge of cabin parts. I am going to start a new plan that will involve modifying some of the parts(as little as possible). But this way FenS can use every timber he has available.

      PS: go to ( Window -> Outliner ) there you can browse all the comp/groups in the model. <balk 9> makes a nice 4m x 4m square.

      Always sleep with a loaded gun under your pillow!

      1 條回覆 最後回覆 回覆 引用 0
      • F 離線
        FenS
        最後由 編輯

        Hi All,

        in Holland it is midnight right now so i really have to go to bed, but i am so happy that you enjoy working on this problem! This is really helping me a lot (and keeping all the wood from going into the fireplace 😉

        I will take a look at the new skp you have posted just now, but will insert mine also.
        I am not that good in moving yet so the parts do not really touch everywhere, but i think you will understand what i was trying back then.
        The first three layers are for making the fundamentals,
        In layer 4 i used beam 4 and opposite of that i used beam 9.
        In layer 5 i used beam 9 and 4 on one side and opposite of that i did the same.
        In layer 6 i turned around what i did in layer 4 (beam 9 and 4)
        in layer 7 i turned around what i did in layer 5 (beam 4 and 9)
        and then i repeated layer 4, 5, 6, 7 several times.
        (in this skp i did not move the parts, i sometimes copied them so the leftovers are not correct).
        In this 'solution' i would have to cut some beams (for instance the pile of beams sticking out and the overlap between beam 4 and 9.
        (i can't remember what exactly, but there was something wrong about this solution which made me stop back then but i'm too tired right now to see what it was).
        Thanks again for your support!


        wrong try2.skp

        Qué sais je? there is still so much to be learned...

        1 條回覆 最後回覆 回覆 引用 0
        • F 離線
          FenS
          最後由 編輯

          Well, i have taken a look at an old excel-sheet i made with some caracteristics of the wood, but that was not really helpful (i tried to read the numbers on the logs, but i did not have the time to move the logs themselves, so i did not know which number corresponded with which log).
          However, these are the only (strange to me) numbers i could read back than and wrote down:
          C2-31 or C23-1?
          B9-1
          N18
          B214
          B165
          N21
          C15
          C61
          C22.1
          B23
          B231

          All the labels (i don't know if this is helpful) were nailed into the log on a side which did not started with a gap, except for B23, that one was nailed to the side with a gap. (and unfortunately i did not write anything for B214 so that (and all the other beams are a mystery)

          Qué sais je? there is still so much to be learned...

          1 條回覆 最後回覆 回覆 引用 0
          • A 離線
            Anthony
            最後由 編輯

            Hi I've been looking at this for a couple of days now and it just occurred to me that if you cut the ends of the wall bauks from the end through the locking whole and on for another foot vertically and did the same to another but opposite then you could join two wall bauks and lock them together with the little blue ones, the same as you would with square timber.this is so simple it may have already have been brought up if not it adds a great deal to flexibility of design I'll try to add an attachment to show you what I mean but I'm new to all this so I may not have success.try

            1 條回覆 最後回覆 回覆 引用 0
            • F 離線
              FenS
              最後由 編輯

              Hi Anthony,

              i emidately downloaded your test.skp and wow!
              Nope, never thought of this and this might just be an extra feature that we might need!
              In the past replies we recieved a lot of good options and if i have some more time to spare, i will combine all these options and hope to come up with (maybe not the initally intended log cabin) a cabin that might be an option.
              This joint is something i didn't think of (i was thinking of cutting it in the middle of the gap and also using the blue ones.
              The results might be the same but in your case it is not possible to move them anymore so probably a much better way.
              Thanks!

              Qué sais je? there is still so much to be learned...

              1 條回覆 最後回覆 回覆 引用 0
              • A 離線
                Anthony
                最後由 編輯

                Back Again I've been playing around with your logs and you may get some ideas from where I'm going with it, bear in mind i'm not a builder and I may run out of wood. All the wood thats there is whats left for me to play with except the one at the far end that I cut up to show you that if you make cuts in the right places and place the doors and window in certen places you can gane extra walls. however I don"t know if all the logs are of the same diametre. have a look anyway.


                a lot less wood.skp

                1 條回覆 最後回覆 回覆 引用 0
                • F 離線
                  FenS
                  最後由 編輯

                  Hi Anthony,

                  really impressive!
                  I think this really is the way we should be thinking!
                  (ofcourse this is with cutting the wood, the other solutions did not yet involve cutting, but in this way we could be getting the bigger house and if that involves cutting, i think this is what we should do.
                  I will also keep on thinking about these solutions,
                  thanks again!
                  (ofcourse thanks to everybody who is involved with this puzzle right now 😉
                  (and indeed, all the logs are in the same diametre)

                  Qué sais je? there is still so much to be learned...

                  1 條回覆 最後回覆 回覆 引用 0
                  • A 離線
                    Anthony
                    最後由 編輯

                    Hi Fred

                    I've decided to drop this design and start again the amount of red Bauks I have left leads me to think there's an extra outer small room or porch because of the two small bauks with 3 cutaways in them. I do believe that the builder is intended to make quite an number of cuts to the timber and the secret to this cabin will be in the amount of wast left over. however I'm happy now to know that there is enough timbre to make an entire cabin so I think it's complete minus the roof Because there is no actual roofing material and the type of roof is left up to the builder which is good because there are lots of different types of roofing ( While I'm on the subject of roof its also occurred to me that the heavy bauk ceiling beams may be for a second flore loft and the little window is for up there that is of course with a high pitched roof). Im trying to look at this as a classy little cabin and no log is sacred.

                    1 條回覆 最後回覆 回覆 引用 0
                    • F 離線
                      FenS
                      最後由 編輯

                      Hi Anthony,

                      I am not that familiar with counting in SU yet so i had just printed your design and was counting the beams in the different walls to be sure how many leftovers there were.

                      I also was supprised about the amount of leftovers and was also going to think about what we could do with that. (but was wondering if that was really leftover or that you copied some beams instead of moving?)

                      for the people working in the shelter, i think a loft maybe would not really be suitable (carrying stuff up a stairs) so maybe an extra small room would be better (we have enough space in the shelter to find a place)

                      Really glad you are helping!

                      Qué sais je? there is still so much to be learned...

                      1 條回覆 最後回覆 回覆 引用 0
                      • A 離線
                        Anthony
                        最後由 編輯

                        Hi Fred

                        Still can't think of how those multi notched bauks fit into the cabin but I had a little fun trying to get the biggest cabin I could with the available wood I had to add a couple of windows a concrete floor with a concrete rise that comes up the height of one bauk and of course there's no roof but its been fun pushing the brain around a bit.

                        I think I recall you said that animals would be kept in this cabin that's why I went for a concrete floor and riser so it would be easy to clean and more hygienic.

                        Have you found out any more about where or what country it was made in.
                        I've been looking around a bit and I saw a picture of a cabin that looked a good fit but there were no plans.

                        I'm new to skechup so this has been great for learning about groups and groups within groups and a lot of other features.


                        just for fun

                        1 條回覆 最後回覆 回覆 引用 0
                        • F 離線
                          FenS
                          最後由 編輯

                          Hi Anthony,

                          ofcourse i emidiately downloaded your skp and wow again!
                          I still really appreciate all the help i already got from all the other sketchers, but i think we are going to call the cabin 'the Anthony' 😄

                          We are the benches? Oh, in the Anthony!

                          This really looks great. And yes, we are probably going to keep some animals in the cabin, but that will be after castration/sterilisation and then they will be in benches recovering from anesthecia.
                          However, i think a concrete floor will be a good solution and in this case we can tell people to create a floor of the correct size so if we go there, we can built the cabin.

                          By the way,
                          are all the bauks outside the cabin really the leftovers that we can still use? (keeps me from counting all the beaks in the cabin itself and trying to find some proper use for them.

                          Oh yeah, the multi notched bauks normally (another volunteer said so) would be used as the second layer, for instance on top of balk-13.
                          That would be the case if you would use balk-09 as ground-beaks.
                          (see my very first picture in this thread on page 1, in that picture i forgot balk-13, but use balk-09 as ground beaks with a multi notched bauks on top of that).

                          And if we have all these blue bauks left, then we could use some of them like Ross did in his previous drawing so they support the roof.

                          Yep, really happy!

                          Qué sais je? there is still so much to be learned...

                          1 條回覆 最後回覆 回覆 引用 0
                          • A 離線
                            Anthony
                            最後由 編輯

                            Hi Fred
                            Yes all the peaces left stacked are the left overs except the green one and the two light blue ones at the far end they are there just to represent that the two light blue ones can be joined to make one green however I'm sure that a better join could easily be made.

                            You said that some of the bauks have holes in them could you be more specific it may give more of a hint as to what they should be used for.

                            The more I look at the available wood the more convinced I am that there's a second floor.so even if we find the right way it may not be the way you finally build it

                            I love a good puzzle and this is one of the best.
                            starting enother one now lets see if I can get a large loft.

                            Talk soon 👍

                            1 條回覆 最後回覆 回覆 引用 0
                            • F 離線
                              FenS
                              最後由 編輯

                              Hi Anthony,

                              i've been puzzling with it for so long that i almost started to hate the cabin 😉
                              i am really looking forward to building the cabin (but i know by now that this can only be done with a good plan. Otherwise we are all running around and since we only have a week and are always trying to do as much as we can, that would be a waste of time.

                              Anyway,
                              uhm, about the remark that some beaks have holes in them. Not quite sure where i said that but what i probably meant is to say that all the holes in the beaks/logs are already there.
                              So if you use the skp that i originally made, then you see all the holes that are available. I have drawn all the holes.

                              About the loft,
                              i told my wife that it might be possible that a loft could be created but that i thought that this might not be handy with climbing stairs and all, but she said that maybe it could be used for sleeping 😄 So don't let me stop you 😉

                              Happy puzzling!

                              Qué sais je? there is still so much to be learned...

                              1 條回覆 最後回覆 回覆 引用 0
                              • A 離線
                                Anthony
                                最後由 編輯

                                Yes Fred I can certainly see how you could get very frustrated with it, some things just don't seem to make sense at all and made even worse knowing that the correct plan would mean much less cutting and would go up in three or four days, minus site preparation, it sounds like your on a very tight schedule and even though a slab would be better it would eat up your allotted time.
                                How long before you go.
                                Ant

                                1 條回覆 最後回覆 回覆 引用 0
                                • F 離線
                                  FenS
                                  最後由 編輯

                                  Hi Ant,

                                  well, basically, we go 2 times a year with as much volunteers as possible.
                                  (a medical team and a team of 'handyman' (not sure what the correct english word is).
                                  I ofcourse am a member of the last team.
                                  We go in April and in September and both times about a week.
                                  However, we also have to make shelter for the dogs, or move shelters to other places, repair locks or make new roofs so basically there is always a lot to do, and to little time to do it in 😄 (we also have to prepare the operationroom for the medical team and maybe we are even going to help in another shelter that needs more help (higher priority than building a cabin)
                                  (and that's why i try to go with some volunteers some trips in between.
                                  It is possible to tell them to make a concrete floor (that is something they can do if we tell them the correct size/coordinates) and if that one is ready when we arrive, then we can start building. (Hopefully in April, but it is also possible that we are going to move some big shelters and put the cabin in that empty spot).
                                  I am (unfortunately 😉 not the one who is deciding that, i just grabbed this problem and am trying to solve it (with a lot of help by you and others)
                                  However, if i can say that we have a possible solution and we know the sizes, than this could become part of our goals for the next trip maybe... I'm hopeful 😄

                                  By the way, a SU-plan of the shelter:
                                  (still work in progress)
                                  http://nl.youtube.com/watch?v=KK_cR76DjAo&feature=channel

                                  Qué sais je? there is still so much to be learned...

                                  1 條回覆 最後回覆 回覆 引用 0
                                  • C 離線
                                    Charlie__V
                                    最後由 編輯

                                    Fred,
                                    You mention counting the cabin components by what I understand to be manually.
                                    Sketchup will give you the current model quantities for any given component by a simple right click and select entity info. (see attached)

                                    Also attached is my third try with an alteration to balk-06.
                                    You mentioned earlier it is possible that some of the logs may not be exact as to notches etc.
                                    So I altered balk-06 to "fit"

                                    I wish you all the best with this project, and have one small request...please post some pictures once the effort begins/finishes.

                                    Charlie


                                    Rt clk..Entity info...


                                    Third...final...attempt

                                    Precision M1710/Win 7 Pro 64 bit/i-7 6920 Quad core 2.9 Ghz -3.8/16Gb ram/NVIDIA M5000M 8Gb

                                    1 條回覆 最後回覆 回覆 引用 0
                                    • F 離線
                                      FenS
                                      最後由 編輯

                                      Hi Charlie,

                                      thanks for your help, and i sure will put the pictures in here once we start with this project (but that could be in April or in September (hopefully not the April after that).
                                      I will take a look at your new skp, thanks for that!
                                      (by the way, i did know about 'entity info', but i got the feeling that in some cases people made groups of there own, so they combined (for example) 6 logs from type 7 with 4 logs from type 8 and made this into a new object and i was not sure if SU would still count them a 6 and 4 logs or just as 1 new object. (pff, that sounds quite difficult 😉

                                      Qué sais je? there is still so much to be learned...

                                      1 條回覆 最後回覆 回覆 引用 0
                                      • A 離線
                                        Anthony
                                        最後由 編輯

                                        Hi Fred
                                        Decided to download this to give you a look at how I think this cabin is surposed to be put together to some extent and unfortunatly if I'm right theres not the right amount of wood to build it as it was intended giveing you a 14 metre long cabin.
                                        Don't bother counting the balks because I've added quite a few. I'm going to try and modify it so it works but this one requires no fancy cuting other than doors and windows.
                                        You may have been down this road yourself it seems too fit.


                                        a lot of wood but not enough.skp

                                        1 條回覆 最後回覆 回覆 引用 0
                                        • F 離線
                                          FenS
                                          最後由 編輯

                                          Hi Anthony,

                                          always wondering if you have post a new one if i check this thread 😄
                                          Today i have spoken to one of the volunteers and as soon as possible 3 or 4 of us are going to meet somewhere and talk about the two shelters that we are helping and we are going to discuss what needs to be done first. (list of priorities) and then we are going to see how much time it will all cost so to decide what we can do in April and so on.
                                          I am really glad that with all these kind of solutions i can show at least some possibilities of building the cabin (and if possible without fancy cutting, that would even be better (less time needed probably).
                                          It should be possible to built the cabin within these days, it is just a matter of the other things that need to be done.
                                          Thanks again for spending your time for this puzzle!

                                          Qué sais je? there is still so much to be learned...

                                          1 條回覆 最後回覆 回覆 引用 0
                                          • F 離線
                                            FenS
                                            最後由 編輯

                                            Hi Anthony,

                                            Still out there?
                                            Wanted to post the following message in a PM, so i wouldn't bother the rest of the community again with my endless cabin, but the PM seems te stuck in the 'outbox', so i'll post it anyway. Sorry guys!

                                            You helped me a lot some time ago with the cabin and in the beginning of March we (my wife and I) are going to the shelter to do some preparation and then in April a lot of us are going to help in the nuteringproject (?) (castration and sterilisation) of dogs and cats and education and about 4 or 5 of us are going to do the jobs in the shelter. Unfortunately this is a little group so we cannot do all that we wanted to do (we also were planning to do some jobs in another part of Bosnia but that will have to wait.
                                            Anyways, the cabin will (I really hate this) not be created in april but i am planning a trip in July with some other people and now i am trying to manage that we put some concrete floot in the shelter in April, so that we can start building in July.
                                            The cabin i liked very much, was your try 'a lot of wood max size' and i am still counting and drawing and calculating to be sure that this one can be build because if it can, then i can ask to create a concrete floor. Some minutes ago however, i heard how much it is going to cost to do that and that is a lot of money (for a volunteer foundation) so i am thinking about creating some kind of wall (only a couple of centimeters high) to put the cabin on (so no concrete inside the cabin).
                                            And that could be possible if the beams that you put on the roof would go down and we use balk-05.
                                            Pff, long story,
                                            what i would want to ask (since you already helped me so much), could i ask you for some more help if i would be needing that?
                                            (like which beams have you used in every wall (i am looking too ofcourse but some groups i cannot find the properties) and which one need to be cut in order to achieve that so i can tell the other people how much work we probably have to do and to figure out in what order we have to stack them)

                                            And (and this is really bad), i am looking at your skp and start to wonder why the beam on the roofs are not in the middle and see that i made a mistake in one of the beams...
                                            Beam-04 really is 4.20 (this is correct) but the hole in the middle really is in the middle (2.10), and not at 2.00.
                                            Would this change your drawing?

                                            I hope not, and i really hope that this year we can finish the cabin (and call it The Anthony)

                                            regards,

                                            Fred.

                                            Qué sais je? there is still so much to be learned...

                                            1 條回覆 最後回覆 回覆 引用 0
                                            • 1
                                            • 2
                                            • 3
                                            • 1 / 3
                                            • 第一個貼文
                                              最後的貼文
                                            Buy SketchPlus
                                            Buy SUbD
                                            Buy WrapR
                                            Buy eBook
                                            Buy Modelur
                                            Buy Vertex Tools
                                            Buy SketchCuisine
                                            Buy FormFonts

                                            Advertisement