sketchucation logo sketchucation
    • Login
    ℹ️ Licensed Extensions | FredoBatch, ElevationProfile, FredoSketch, LayOps, MatSim and Pic2Shape will require license from Sept 1st More Info

    From SketchUp to Reality

    Scheduled Pinned Locked Moved Corner Bar
    91 Posts 22 Posters 8.5k Views 22 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • daleD Offline
      dale
      last edited by

      In the oddball things that happen on the jobsite department:

      We let the foundation reach a 7 day compressive strength, and did a bit of back filling to make it easier to get in to the building. The site is on an ancient creek bed, and has lots of very large rocks.
      The cat hit a large flat sloped rock, and side slipped down stopping with the blade about 1/2" from the styrofoam wall.Screen shot 2011-09-10 at 6.15.13 AM.png

      Our neighbour has a little excavator so we got him to come over and help extricate the cat avaoiding a "cat tastrophy"Screen shot 2011-09-10 at 6.15.29 AM.png

      Just before backfilling we discovered a nest of Juncos in the dirt bank of the excavation. We built the a little styrofoam nest, and a plywood condo, and hung it off the Quadlock wall just above where the nest had been in the bank. It took the adult birds a couple of hours, but they eventually found the nestlings, and stated feeding them until they fledged and flew.Screen shot 2011-09-10 at 6.17.33 AM.png


      Screen shot 2011-09-10 at 6.16.09 AM.png

      Just monkeying around....like Monsanto

      1 Reply Last reply Reply Quote 0
      • daleD Offline
        dale
        last edited by

        The floor is 11 7/8 TJI's, which as I mentioned we joist hung from the ledger LVLs spanning over top of the main beam. Then we put down a 3/4" (19mm) t&g subfloor and the second floor Quadlock walls up.Screen shot 2011-09-10 at 6.32.18 AM.pngScreen shot 2011-09-10 at 6.33.02 AM.png

        Just monkeying around....like Monsanto

        1 Reply Last reply Reply Quote 0
        • daleD Offline
          dale
          last edited by

          But the nice thing about being able to model is that you can keep refining the design process as you do the grunt work. So, we were busy working out what the kitchen was going to be like.
          So back to SketchUp.Mcbride Kitchen Revision June 29~.png
          and over to Thea for some visuals.Screen shot 2011-09-10 at 6.40.00 AM.pngScreen shot 2011-09-10 at 6.40.19 AM.png

          Just monkeying around....like Monsanto

          1 Reply Last reply Reply Quote 0
          • B Offline
            bytor
            last edited by

            Dale,

            Following this great thread as it is very interesting and informative. My favorite part is the two pictures of the Juncos! Most would not bother, but you chose to be a steward of your environment and friend of nature. Great to see this! 👍

            Dean

            Find the Cost of Freedom.....

            1 Reply Last reply Reply Quote 0
            • L Offline
              llaves
              last edited by

              Dale:
              In one of your early posts you mention that the ICFs are 4" of foam on one side, 2" on the other, which would give a reasonably insulated wall. (My pet peeve is the extremism of some folks in massively insulating walls/roofs, where they have long reached the point of diminishing returns compared to improving windows or some other system in the design.) Looking at the picture of the cat nearly hitting your wall, the inside and outside foam layers look the same thickness. Is this an illusion, or are both the inner and outer layers at this point 2" (or 4")?

              Compared to your situation, we didn't hit a single rock excavating for our house. We're on a mesa (I'm in New Mexico) whose what I'm told is called Aeolian - it's very dense sand deposited over a long period of time by the wind. It's very stable - you can dig a five foot deep trench with straight walls and it requires no shoring. (That's a practical statement, not a matter of safety practice. ) In digging our foundations (42" deep, 3' wide), we didn't encounter a single rock!

              1 Reply Last reply Reply Quote 0
              • Mike LuceyM Offline
                Mike Lucey
                last edited by

                Dale, this is getting more interesting with each episode you post and turning into a Master Class. We are all following. BTW, did you model the bird house in SketchUp .... you will now have to keep us updated on the fledglings progress also.

                Support us so we can support you! Upgrade to Premium Membership!

                1 Reply Last reply Reply Quote 0
                • daleD Offline
                  dale
                  last edited by

                  @llaves said:

                  Dale:
                  In one of your early posts you mention that the ICFs are 4" of foam on one side, 2" on the other, which would give a reasonably insulated wall. (My pet peeve is the extremism of some folks in massively insulating walls/roofs, where they have long reached the point of diminishing returns compared to improving windows or some other system in the design.) Looking at the picture of the cat nearly hitting your wall, the inside and outside foam layers look the same thickness. Is this an illusion, or are both the inner and outer layers at this point 2" (or 4")?

                  Compared to your situation, we didn't hit a single rock excavating for our house. We're on a mesa (I'm in New Mexico) whose what I'm told is called Aeolian - it's very dense sand deposited over a long period of time by the wind. It's very stable - you can dig a five foot deep trench with straight walls and it requires no shoring. (That's a practical statement, not a matter of safety practice. ) In digging our foundations (42" deep, 3' wide), we didn't encounter a single rock!

                  llaves.
                  Ours is 2" and 2" styrofoam with 8" concrete. I probably should have found that particular visual, as I just quickly pulled this one off the Quadlock website.
                  Although we get some extreme temperatures here (-40 F ) they seldom last for long.
                  When we did the heat loss calculations I did as you said, and looked at a cost/performance comparison. I also had a long talk with my contact at Quadlock, who is kind of a roving teacher, technician, and he advised that he uses the 4" combinations only when the temperatures get down really low for extended periods.
                  I have used 4"/8"/4" combination on the community hall in town here. On that building we were originally going for a Leed Standard, and the heating system is employing waste heat from the Ice Arena next door to it so we wanted to have really high insulation standards.
                  They are just completing the Ice arena connection now, so it will be interesting to get to see how it performs.
                  As for windows, I totally agree.We have gone with Low E, argon filled with superspacer. Again we opted out of triple glaze, as the cost performance projection just didn't seem worth it.

                  I envy your rock situation. We have some the size of volkswagens.
                  When the fellow who owns the property next to ours saw our geo-exchange ground loops, he decided to go with it as well. When he dug he hit all clay, and in 1600 feet of trench hit 3 rocks.

                  Just monkeying around....like Monsanto

                  1 Reply Last reply Reply Quote 0
                  • daleD Offline
                    dale
                    last edited by

                    @mike lucey said:

                    Dale, this is getting more interesting with each episode you post and turning into a Master Class. We are all following. BTW, did you model the bird house in SketchUp .... you will now have to keep us updated on the fledglings progress also.

                    Mike
                    As I said I am a little behind on posting this as in reality we are just finishing framing, so I can tell you the Juncos were a real riot.
                    When they fledged, they moved in under a pallet of peel and stick roofing underlay, and since they are seed eater, kind of ground birds, they were constantly darting around the jobsite.

                    Just monkeying around....like Monsanto

                    1 Reply Last reply Reply Quote 0
                    • daleD Offline
                      dale
                      last edited by

                      In reality, I can't wait to get to the cabinetmaking part of the project, as this is my favourite thing in all the building process, but....
                      There is in fact the real "reality" .....Screen shot 2011-09-11 at 7.32.14 AM.png
                      So the underground servicing goes in so that we can insulate the slab for infloor hydronics.
                      This is code here to have a minimum of R-12 under a heated slab. We have 2" foam which gives us R-14 mostly because R-12 is hard to get.
                      We also used this as a vapour barrier, and Judy tuck taped all the joints with connection to the Quadlock.
                      Then we added the 6X6 (152.4 X 152.4 mm )welded wire mesh, and were ready to pour.Screen shot 2011-09-11 at 7.39.16 AM.png

                      Just monkeying around....like Monsanto

                      1 Reply Last reply Reply Quote 0
                      • daleD Offline
                        dale
                        last edited by

                        There is a community of Mennonites here, all of which are meticulous hard workers.
                        We subbed the concrete placement and finishing out to them.Screen shot 2011-09-11 at 7.48.38 AM.pngScreen shot 2011-09-11 at 7.50.31 AM.png
                        The last photo shows the hydronic pipes tied to the 6x6 mesh. The Geo-exchange system requires shorter loops, an maximum of 200'(61 m), and a 6" centre from pipe to pipe.
                        This is apparently because the system is more efficient if the water is returned at a slightly higher temperature.
                        We have done many water based Geo-exchange system, but this is my first ground based system, so I'm asking lots of questions, and generally being a pest.


                        Screen shot 2011-09-11 at 7.49.53 AM.png

                        Just monkeying around....like Monsanto

                        1 Reply Last reply Reply Quote 0
                        • daleD Offline
                          dale
                          last edited by

                          Then on to trusses.
                          I was pretty specific about the style of trusses I wanted, as we had a few details we wanted to include, like extending overhangs of the lower chord so that it would act as a valance for potlights, and just internal ceiling shapes and heights.
                          Again SketchUp is just so easy to get your communications across.
                          I even convinced the tech to down load the free version so he could pull measurements, and walked him through the basics. Needless to say he was pretty impressed.Screen shot 2011-09-14 at 7.00.18 AM.png
                          Living room trusses on LVL BeamScreen shot 2011-09-14 at 6.55.25 AM.png
                          Framing the lookouts.Screen shot 2011-09-14 at 6.56.18 AM.png

                          Just monkeying around....like Monsanto

                          1 Reply Last reply Reply Quote 0
                          • J Offline
                            JuanV.Soler
                            last edited by

                            very tidy and clean all the process
                            huge job

                            ,))),

                            1 Reply Last reply Reply Quote 0
                            • daleD Offline
                              dale
                              last edited by

                              Juan
                              Thank you a very appreciated comment from you.

                              Dale

                              Just monkeying around....like Monsanto

                              1 Reply Last reply Reply Quote 0
                              • Mike LuceyM Offline
                                Mike Lucey
                                last edited by

                                Great stuff Dale.

                                Some complex trusses there especially the sloping one over the ??? room. I imagine the void will be useful for services.

                                Is there any chance we could have a look at the plan layout so we can get a good overview?

                                Mike

                                Support us so we can support you! Upgrade to Premium Membership!

                                1 Reply Last reply Reply Quote 0
                                • daleD Offline
                                  dale
                                  last edited by

                                  Hi Mike
                                  Here are the floor plans for the main and the lower floor and a section.
                                  Really crazy here right now so I will post some more shortly.
                                  Cheers
                                  DaleScreen shot 2011-09-15 at 7.28.20 AM.pngScreen shot 2011-09-15 at 7.28.42 AM.png


                                  Screen shot 2011-09-15 at 7.28.30 AM.png

                                  Just monkeying around....like Monsanto

                                  1 Reply Last reply Reply Quote 0
                                  • daleD Offline
                                    dale
                                    last edited by

                                    This is a hijack your own post notification:
                                    As an aside to my own house project, another project on the books just had a grand opening.
                                    This to was a from SketchUp to reality project, so I decided to include it as an aside.the SketchUp model:Screen shot 2011-09-15 at 8.21.56 PM.png
                                    The rendering:Screen shot 2011-09-15 at 8.22.50 PM.png
                                    Reality:Screen shot 2011-09-15 at 8.00.56 PM.png
                                    Opening ceremonies ribbon in place:Quinsam LQ.jpg
                                    Interior ClerestoryScreen shot 2011-09-15 at 8.36.19 PM.png

                                    Just monkeying around....like Monsanto

                                    1 Reply Last reply Reply Quote 0
                                    • Mike LuceyM Offline
                                      Mike Lucey
                                      last edited by

                                      Thanks for posting your house plans Dale. The layout works well. The house looks to be designed for two to three residents? BTW, I will be using your semi-circle direction line (on half landing) in my stairs plan in future 👍

                                      Support us so we can support you! Upgrade to Premium Membership!

                                      1 Reply Last reply Reply Quote 0
                                      • daleD Offline
                                        dale
                                        last edited by

                                        Yes Mike it is built for Judy and I, and the studios double as guest rooms. The design is very personal combining things we have liked about our previous residences.
                                        I think it is harder in a way to design your own project.
                                        We have also made it so that we can live entirely on the main floor should the time come that we have problems with stairs by doing things like roughing in plumbing in the little pantry area.

                                        Just monkeying around....like Monsanto

                                        1 Reply Last reply Reply Quote 0
                                        • daleD Offline
                                          dale
                                          last edited by

                                          The ground source Geo-exchange system was a big project.
                                          We put in 1800 lineal feet (548 m) which required us to dig trenches about 6'(1.8 m) deep x 10'(3 m)Screen shot 2011-09-18 at 6.58.52 AM.pngScreen shot 2011-09-18 at 6.41.04 AM.pngScreen shot 2011-09-18 at 6.42.21 AM.png

                                          The headers were fused chemically fused to the pipes for the two trenches. When we buried them they were separated by about 2'.


                                          Screen shot 2011-09-18 at 6.48.23 AM.png

                                          Just monkeying around....like Monsanto

                                          1 Reply Last reply Reply Quote 0
                                          • Mike LuceyM Offline
                                            Mike Lucey
                                            last edited by

                                            Hey Dale, Do you guys sweep the ground before taking the pictures? Everything is so neat and tidy 😉

                                            I'm very interested in learning how the geothermal system works out. I have never (yet) been involved in an install.

                                            I have a similar layout in my humble abode. We (Pauline and I) could live on one floor if the need arose. However I would have to do a major tidy up of all my bits and pieces 😒

                                            Mike

                                            Support us so we can support you! Upgrade to Premium Membership!

                                            1 Reply Last reply Reply Quote 0
                                            • 1
                                            • 2
                                            • 3
                                            • 4
                                            • 5
                                            • 2 / 5
                                            • First post
                                              Last post
                                            Buy SketchPlus
                                            Buy SUbD
                                            Buy WrapR
                                            Buy eBook
                                            Buy Modelur
                                            Buy Vertex Tools
                                            Buy SketchCuisine
                                            Buy FormFonts

                                            Advertisement