sketchucation logo sketchucation
    • Login
    ℹ️ Licensed Extensions | FredoBatch, ElevationProfile, FredoSketch, LayOps, MatSim and Pic2Shape will require license from Sept 1st More Info

    The Bridge

    Scheduled Pinned Locked Moved Gallery
    15 Posts 11 Posters 856 Views 11 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • Large_BlackL Offline
      Large_Black
      last edited by

      Thanks to all of you guys,

      @ Bryan K:
      Thanks man, yes I think so,
      I've asked administrator for move the post in the right gallery section. Waiting for a reply.
      @ Pilou:
      From the first mild structural surveys (it is mainly a contest of ideas) we found that the stiffness of the bridge deck body formed concomitantly with its pillars positioned at both ends of the platform is likely to win the torsion exercising by the cables on opposite sides of the roadway, in reality could fit on even without the antennas, but these allow to greatly reduce the amount of steel and the density of the concrete necessary for the structure to hold.

      Ciao πŸ˜„

      1 Reply Last reply Reply Quote 0
      • boofredlayB Offline
        boofredlay
        last edited by

        Very impressive.

        http://www.coroflot.com/boofredlay

        1 Reply Last reply Reply Quote 0
        • elmerE Offline
          elmer
          last edited by

          Very interesting bridge concept and glorious rendering.
          4 days work....wow πŸ‘

          1 Reply Last reply Reply Quote 0
          • allanxA Offline
            allanx
            last edited by

            This awesome work..great job...

            allanx

            [Portfolio](https://www.coroflot.com/designers/work-stream?id)

            1 Reply Last reply Reply Quote 0
            • Large_BlackL Offline
              Large_Black
              last edited by

              Thanks guys,

              I am very pleased that you enjoyed these images, the result of hard work for 16 hours per day.

              Many things can certainly be improved, as the curves at the ends of the bridge (could be much smoother), and the materials (being able to work on and doing some more tests surely I can achieve more realistic results).

              But we are not complaining, the important thing is to be paid .... 😎

              Ciao πŸ˜„

              1 Reply Last reply Reply Quote 0
              • elmerE Offline
                elmer
                last edited by

                Oh! Good, I though one day ment 24 hours..... πŸ˜‰

                1 Reply Last reply Reply Quote 0
                • pbacotP Offline
                  pbacot
                  last edited by

                  It's great! Thanks for sharing these images here.

                  MacOSX MojaveSketchUp Pro v19 Twilight v2 Thea v3 PowerCADD

                  1 Reply Last reply Reply Quote 0
                  • tademaT Offline
                    tadema
                    last edited by

                    Great set of images. Thea seems to produce a fantastic render.
                    John

                    1 Reply Last reply Reply Quote 0
                    • M Offline
                      Milo
                      last edited by

                      Very good job. I appreciate the photographic integration because it is not so easy to do. I like your concept but I do not understand the link between cort-en and white masts. Anyway good luck for the contest πŸ˜‰

                      FaceBook

                      1 Reply Last reply Reply Quote 0
                      • Large_BlackL Offline
                        Large_Black
                        last edited by

                        Thank you again guys,

                        @ Tadema: Thank you!
                        Yes, thea gives a lot of satisfaction, in my opinion has enormous potential, and it seems that the latest release can do remarkable things. The materials laboratory is a little complex, but when you start to pick up confidence you can get impressive results.

                        @ Milo: Thank you man, image composition and integration of the bridge with the surrounding environment was the hardest of the work, I'm glad that the result is credible. I did not understand what you mean with "link between cort-en and white masts."

                        Here a wireframe, just to take a look of the structure behind.

                        Ciao πŸ˜„


                        wireframe.png

                        1 Reply Last reply Reply Quote 0
                        • 1 / 1
                        • First post
                          Last post
                        Buy SketchPlus
                        Buy SUbD
                        Buy WrapR
                        Buy eBook
                        Buy Modelur
                        Buy Vertex Tools
                        Buy SketchCuisine
                        Buy FormFonts

                        Advertisement