sketchucation logo sketchucation
    • Login
    ⌛ Sale Ending | 30% Off Profile Builder 4 ends 30th September

    Door schedule Layout 2013

    Scheduled Pinned Locked Moved LayOut Discussions
    layout
    12 Posts 8 Posters 4.6k Views 8 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • pbacotP Offline
      pbacot
      last edited by

      I have just noted on another thread: I have luck printing to pdf then insert the pdf. Thereafter keep the same process and update the pdf in LO. Keep a folder with such pdfs for the project. Always print (overwrite) to the same file and update in LO. You don't have to position it or anything. Haven't tried rtf. Be sure to save your original WP file so that it reflects what you output in the pdf. Update is instantaneous.

      MacOSX MojaveSketchUp Pro v19 Twilight v2 Thea v3 PowerCADD

      1 Reply Last reply Reply Quote 0
      • Dave RD Offline
        Dave R
        last edited by

        Regarding editing rtf files, don't edit them in LayOut. Right click on the text box and choose Edit in Text Editor. Word or whatever editor is the default to open RTF files will open. Make your edits and save the file. It will be updated in LO automatically.

        If you do decide to replace the RTF file with a different one, Make the new RTF file. It can have the same name as the original. Go to File>Document Setup>References. Select the line for the RTF file, unlink it and then relink to the new file.

        Etaoin Shrdlu

        %

        (THERE'S NO PLACE LIKE)

        G28 X0.0 Y0.0 Z0.0

        M30

        %

        1 Reply Last reply Reply Quote 0
        • RichardR Offline
          Richard
          last edited by

          If you are actually creating a diagramatic schedule as Krisidious shows, just draw them raw in LO so you can edit how you like. Will take 1/10th the time of doing it in SU and dragging the model in and stuffing around!

          [BUILTBRAND.COM.AU](http://builtbrand.com.au/)

          1 Reply Last reply Reply Quote 0
          • bmikeB Offline
            bmike
            last edited by

            @krisidious said:

            if you notice the symbol above the windows and doors, that is inside the component. It hides inside the wall in 3D and then I have another one on the floor level in the doorway.

            Would love to learn more on how this works...

            mike beganyi design + consulting llc

            1 Reply Last reply Reply Quote 0
            • arail1A Offline
              arail1
              last edited by

              @bmike said:

              Would love to learn more on how this works...

              +1

              1 Reply Last reply Reply Quote 0
              • bmikeB Offline
                bmike
                last edited by

                Nice, figured it out with some testing.
                Clever.

                Might have to do something similar with timber sizing... hmmm.

                -Mike

                mike beganyi design + consulting llc

                1 Reply Last reply Reply Quote 0
                • Dave RD Offline
                  Dave R
                  last edited by

                  Cool idea.

                  I expect there's a lot more of that sort of thing that could be done with nesting components and things like 3D text.

                  Etaoin Shrdlu

                  %

                  (THERE'S NO PLACE LIKE)

                  G28 X0.0 Y0.0 Z0.0

                  M30

                  %

                  1 Reply Last reply Reply Quote 0
                  • KrisidiousK Offline
                    Krisidious
                    last edited by

                    well, it's really simple.

                    I take all my doors and windows in a model and make a copy of the component and then line them up. (this is after design.) Then I use the 3D text tool to create the number/symbol geometry... 1 vertical and one horizontal on the floor level. I put all of this geometry on a layer called symbols, so that I can turn it on and off when needed. The vertical symbol is placed about a foot above the geometry within the door or window component. This way it is inside of the wall and not seen in 3D perspective views.

                    examples

                    component alone with symbols

                    component alone without symbols

                    component in model with symbols

                    component in model without symbols

                    component example with layers

                    plan view

                    schedule view

                    By: Kristoff Rand
                    Home DesignerUnique House Plans

                    1 Reply Last reply Reply Quote 0
                    • KrisidiousK Offline
                      Krisidious
                      last edited by

                      added plan views.

                      By: Kristoff Rand
                      Home DesignerUnique House Plans

                      1 Reply Last reply Reply Quote 0
                      • brettsichellodesignB Offline
                        brettsichellodesign
                        last edited by

                        I thought I would go through my method for window schedules using components, excel and tables and see if anyone has any tips to streamline the process. The method is similar to the one previously mentioned, however it uses the new table referencing in SU 2017.

                        1. Build windows as components and place where you want them in the building.

                        2. Create copy of component windows and place them (nicely lined up) somewhere else in your model. Create scene.

                        Tip: Be sure to place them where they will not obscure other scenes.
                        Tip: You can use a section line to cut out an area of the model in certain scenes. I have done this before when my copy of components was in the way of my elevations of the main building.

                        1. Add dimensions and information into PHPP (This example was a passive house).

                        2. Reference cells from PHPP spreadsheet into window schedule spreadsheet.

                        3. Insert window schedule spreadsheet into LO drawing. (Make auto update as it takes no time to render).

                        4. Insert SU model and select scene where you set up window copy components.

                        1 Reply Last reply Reply Quote 0
                        • 1 / 1
                        • First post
                          Last post
                        Buy SketchPlus
                        Buy SUbD
                        Buy WrapR
                        Buy eBook
                        Buy Modelur
                        Buy Vertex Tools
                        Buy SketchCuisine
                        Buy FormFonts

                        Advertisement