sketchucation logo sketchucation
    • Login
    ℹ️ Licensed Extensions | FredoBatch, ElevationProfile, FredoSketch, LayOps, MatSim and Pic2Shape will require license from Sept 1st More Info

    :Lancaster Lofts:

    Scheduled Pinned Locked Moved Gallery
    21 Posts 10 Posters 1.6k Views 10 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • marked001M Offline
      marked001
      last edited by

      Looks like this project might actually happen. Slowly getting time to update the model/design.... it gained a floor on the front and I put together a quick image for the lobby.


      LancasterLofts_V1 112012.jpg


      LancasterLofts_V5 112612.jpg

      http://www.revision21vis.com

      instagram: revi21on

      1 Reply Last reply Reply Quote 0
      • Chris FullmerC Offline
        Chris Fullmer
        last edited by

        The renders are absolutely amazing Jason!

        2 complaints on the design though. The stairs in the courtyard image seem very steep. And the walkway the girl is standing on would NOT work for bare feet. I'm not even sure if it's legal at all! But it is a cool idea.

        Lately you've been tan, suspicious for the winter.
        All my Plugins I've written

        1 Reply Last reply Reply Quote 0
        • marked001M Offline
          marked001
          last edited by

          haha.. yeah, agreed on both. those were quick and conceptual. the stairs were stretched and fudged into place in a rush and the grating is definitely gone now.

          http://www.revision21vis.com

          instagram: revi21on

          1 Reply Last reply Reply Quote 0
          • marked001M Offline
            marked001
            last edited by

            here are the updates to the interior courtyard and rear. it remained pretty true to concept. the window placements aren't ideal but they're not based on the unit layouts; the angles of the faceted facade aren't quite as steep unfortunately; and the whole thing flipped to take advantage of an adjacent party wall.


            V2 120612.jpg


            V3 120612.jpg


            V4 120612.jpg


            V6 120612.jpg

            http://www.revision21vis.com

            instagram: revi21on

            1 Reply Last reply Reply Quote 0
            • Bryan KB Offline
              Bryan K
              last edited by

              Great updates.

              See my portfolio at https://delphiscousin.blogspot.com/

              1 Reply Last reply Reply Quote 0
              • marked001M Offline
                marked001
                last edited by

                Thanks Bryan.

                http://www.revision21vis.com

                instagram: revi21on

                1 Reply Last reply Reply Quote 0
                • marked001M Offline
                  marked001
                  last edited by

                  the inner courtyard of this lost its sawtooth pattern and the front facade couldnt be salvaged, but its more or less intact and construction has started..


                  Front


                  Courtyard


                  Courtyard


                  Updated Render of Courtyard

                  http://www.revision21vis.com

                  instagram: revi21on

                  1 Reply Last reply Reply Quote 0
                  • RichardR Offline
                    Richard
                    last edited by

                    Nice mate, great project!!!!!!!!!

                    Wondering though about the process there during construction, it looks as though the whole wall is first clad in ply and then the opening cut out? Is this right?

                    [BUILTBRAND.COM.AU](http://builtbrand.com.au/)

                    1 Reply Last reply Reply Quote 0
                    • marked001M Offline
                      marked001
                      last edited by

                      Yeah that's how they're doing it...moves along much quicker. Cut it out from the inside after the fact.

                      http://www.revision21vis.com

                      instagram: revi21on

                      1 Reply Last reply Reply Quote 0
                      • RichardR Offline
                        Richard
                        last edited by

                        Wow! Seems like MASSIVE waste, everything here these days is about waste saving! I know plywood has a tonne of reuse options, but still! 😞

                        [BUILTBRAND.COM.AU](http://builtbrand.com.au/)

                        1 Reply Last reply Reply Quote 0
                        • marked001M Offline
                          marked001
                          last edited by

                          What's the other option? Even if you cut it beforehand, you're cutting out the same amount. Otherwise, you'd end up with a bunch of small pieces all over and that can't be good for shear strength.

                          http://www.revision21vis.com

                          instagram: revi21on

                          1 Reply Last reply Reply Quote 0
                          • RichardR Offline
                            Richard
                            last edited by

                            @marked001 said:

                            What's the other option? Even if you cut it beforehand, you're cutting out the same amount. Otherwise, you'd end up with a bunch of small pieces all over and that can't be good for shear strength.

                            Mate we tend to design it in! Making sure all panels / windows and opening work at 300mm grids - then the use of a 2400mm or 2700mm sheet can be cut to 600/900/1200/1500/1800/2100 and then the offcut of any sheet has a re positioning option within the wall.

                            I'm just doing this exercise now on a house design where everything works in off shelf SIP panels @ 900 or 1200 wide x 2400/2700/3000 high - then ply linings at 900 wide x 2400 high and built in joinery at 600 and 900 - the total waste will fill a wheel burrow and virtually no onsite cutting.

                            We look at:

                            The cost of excess material, all all reasons of environment, transport and budget.
                            Any waste if it cant be stored, the cost of disposal,
                            Speed of building.
                            The embodied energy in that waste.

                            It also helps too if any post completion off cuts are of these multiple sizes as if they can be stored they will have a purpose later!

                            [BUILTBRAND.COM.AU](http://builtbrand.com.au/)

                            1 Reply Last reply Reply Quote 0
                            • marked001M Offline
                              marked001
                              last edited by

                              very cool! and def makes sense to do that with new construction.

                              http://www.revision21vis.com

                              instagram: revi21on

                              1 Reply Last reply Reply Quote 0
                              • 1
                              • 2
                              • 1 / 2
                              • First post
                                Last post
                              Buy SketchPlus
                              Buy SUbD
                              Buy WrapR
                              Buy eBook
                              Buy Modelur
                              Buy Vertex Tools
                              Buy SketchCuisine
                              Buy FormFonts

                              Advertisement