Control of work-time of a drawing
-
Hello
Is there a way to control the time passed on a drawing , making too the difference between real work and drawing open without work ?
It is our wish to determine the time passed with every project. We have tried to note on a book, but it is really impossible to follow.
Merci
Marc -
I have not used it or seen it in action, but TBD has a script called time.rb that does this.
Check it out, its only $5.00 USD
Chris
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register LoginAdvertisement