• Login
sketchucation logo sketchucation
  • Login
ℹ️ GoFundMe | Our friend Gus Robatto needs some help in a challenging time Learn More

Adding a cost structure to Dynamic Components

Scheduled Pinned Locked Moved Dynamic Components
sketchup
1 Posts 1 Posters 754 Views
Loading More Posts
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • D Offline
    DaveM65
    last edited by 18 Jun 2013, 08:23

    Hi Guys

    I know this is a bit of a strange question, but I will outline what I want to do...

    Basically, I design exhibition stands in sketch up, using components, these are usually a system based set of components that are used to construct the main frame work of the stand, what I wanted to know was if there is a way of allocating a single cost to each of the components and being able to bring up a total cost for all components used in the design. I don’t want to have to count each of the items every time as its time consuming.

    I understand you can add a cost for a material, but that does not quite do what I would like it to do.

    I look forward to your replies

    Thanks

    Dave

    1 Reply Last reply Reply Quote 0
    • 1 / 1
    1 / 1
    • First post
      1/1
      Last post
    Buy SketchPlus
    Buy SUbD
    Buy WrapR
    Buy eBook
    Buy Modelur
    Buy Vertex Tools
    Buy SketchCuisine
    Buy FormFonts

    Advertisement