Hello. I'm new here and I decided to show you some of my works. First of all this project is still in progress, so this one is not completed. I've worked on this subway line now for two weeks and this is what I've made. 5.6 kilometres of subway network (2.5 km on ground). There are five lines. The orange one is almost ready (four stations not built yet). Stations need some finishing touches and the tracks need to be installed in to the tunnels and ground. I've made also some simple buildings near the Cape station. Now to the pics.
Here you can see parts of the network map. Notice the northern cape with buildings.
It's this one.
The cape with some major company headquarters and residential high-rises. Notice the start of the tunnel.
The tunnel.
The main line passes the station at the lower level. The new line starts from the upper level.
Two-level station from inside. Upper line goes to south and the lower one heads to north.
Another station..
..with transparency on.
Station in progress.
Grand Station. Commuter and long distance train station will be right above this station.
Same station from inside. The Red Line overpasses this lower level.
Hope you like these pics. If you have any ideas of this project. Just PM me.