sketchucation logo sketchucation
    • Login
    ℹ️ Licensed Extensions | FredoBatch, ElevationProfile, FredoSketch, LayOps, MatSim and Pic2Shape will require license from Sept 1st More Info

    Quick and Dirty Spec House

    Scheduled Pinned Locked Moved Gallery
    4 Posts 3 Posters 330 Views 3 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • S Offline
      seabass84
      last edited by

      Cranked this one out in half a day for a client. Thought it came out great!

      http://i215.photobucket.com/albums/cc246/seabass84/Render6_zpsf5b2c4d1.jpg

      1 Reply Last reply Reply Quote 0
      • L Offline
        L8Sunrise
        last edited by

        Hi there,

        Half a day?! That's pretty damn impressive.

        There is still room for improvement, but I don't think anyone can complain about the quality when your turnaround time is measured in hours rather than days.

        I think it's great you can work that fast. The quickest turnaround I can manage for an image like this one would be 24 hours and that's only if I'm glued to the chair with no breaks in between. I guess that's one reason why I'm not doing well as a freelancer.

        Did you use Podium? I think I recognise some of the elements that you used in the scene.

        Regards,

        Ken.

        1 Reply Last reply Reply Quote 0
        • cheddaC Offline
          chedda
          last edited by

          Sketchup shines when speed is needed. Good work for the turnaround. I did an overnight 10hr shift recently, it is possible although i didn't use maxwell in that instance !

          Kraken Wrangler https://www.flickr.com/photos/132441293@N03/

          1 Reply Last reply Reply Quote 0
          • S Offline
            seabass84
            last edited by

            Working from construction drawings speeds up the process 😄I've cranked out models faster from sketches

            Maxwell was used to accurately model the lighting from an HDRI and many elements from the Podium model pack bring a bit of realism to a smaller budget render.

            I did this one in 4 hours from a JPG architectural sketch

            http://i215.photobucket.com/albums/cc246/seabass84/Render2-2_zps55b154fa.png

            1 Reply Last reply Reply Quote 0
            • 1 / 1
            • First post
              Last post
            Buy SketchPlus
            Buy SUbD
            Buy WrapR
            Buy eBook
            Buy Modelur
            Buy Vertex Tools
            Buy SketchCuisine
            Buy FormFonts

            Advertisement