High Rise
-
This is a project I worked on 2 years ago. It never got built, at least not by our firm or not that I know of. The design went through many changes over the time we worked on it, I controlled the SU model for visual studies while CD's were being worked on in DataCAD. Right before we switched to Revit. Not many CD's were produced, mainly just floor plans.
The first set of images were color studies showing the different layouts and structure. Each color represented a different layout and the red was the structure. Then we went into glass studies, parking deck studies and so on. The last few are SU models placed in context.
It is nothing overly spectacular, I just wanted to share.
I hope you enjoy.
-
Thats good work Boo!
How long is the cone on for?
-
Very cool Boo!
-
Looks like a ton of work Eric. Models of High Rises always look so impressive. I really like the ones where you have placed it in context and done some colour studies.
Thanks for sharing. Nice work. -
Thanks for the comments all, I appreciate it.
@tobobo said:
Thats good work Boo!
How long is the gone on for?
I believe I worked on the project on an off for 6 months or so before the project went South.
-
Thats very strange
I wrote 'cone'
[/quote][quote="Tobobo":1n1rgsf5]Thats good work Boo!How long is the cone on for?[/quote:1n1rgsf5]
I the quote you put in said 'gone'
[quote="Boofredlay":1n1rgsf5]Thanks for the comments all, I appreciate it.
[quote="Tobobo":1n1rgsf5]Thats good work Boo!
How long is the gone on for?[/quote:1n1rgsf5]
I believe I worked on the project on an off for 6 months or so before the project went South.[/quote:1n1rgsf5]
I was trying to be funny about your avatar
-
@tobobo said:
Thats very strange...
Sorry, I edited your quote when I posted. And I did not even edit it properly...
Bad habit of mine I guess.The cone is off BTW. It was only on for 10 days or so until her incision healed. No babies for this pup.
Thanks Coen.
Advertisement